Two, wiring, installation, use guide:
The 1Wiring Regulations see photos. Mounting hole wiring board
2according to the selection of main control instrument and load conditions selected wiring diagram of a wiring diagram, strictly according to the selected terminal wiring diagram.
3following the occurrence of phenomena of wiring error:
A. master controlling meter is full output, but the three-phase voltage across the load to the power supply voltage of95%, B, C two-phase power supply fault phase can be caused by, B, C two-phase power line into the line on the solution.
B. as main control instrument has the output load voltage without voltage, or the severe wobble, try will be added at the input end of the"1","2" terminal swap. As long as in strict accordance with the additional device manual wiring and operation does not occur, the abnormal condition.
The 5 driving induction furnace, transformers and inductive load should be separate orders.
6in particular: the additional device operating voltage must be with the main control instrument in power coincide, such as the main control instrument using the 380V voltage, additional device should also use the 380V voltage specification, all three-phase power should be strictly in accordance with the attached wiring diagram provided the phase sequence connection, or because the phase inconsistency caused a road load can not be full power operation or load two terminal voltage jitter, issues such as out of control.
|